6 problems to pay attention to before and after the construction of foamed concrete

Guotai Junan released a research report saying that under the background of carbon neutrality, the scarcity of coal mines is prominent, and the value of assets will continue to increase. The high point of capital expenditure in the coal industry appeared in 2012. Under the general direction of carbon neutrality, the overall investment in the industry has slowed down, and capital expenditure has gradually declined. From 2021 to now, the Energy Bureau of the National Development and Reform Commission has only newly approved 17.4 million tons of foamed concrete.

1. Determine the material

The compatibility of cement foaming agents and the foaming machine is the first consideration. Because there is a problem with compatibility between cement foaming agent and cement foaming machine. To understand the compatibility of the cement foaming agent, it is also necessary to determine the reasonable dilution ratio of the foaming agent. If it is the first time using the cement foaming agent, it is recommended to refer to the dilution ratio recommended by the manufacturer and then combine it with your machine test to find the most suitable dilution ratio.

2. Cleaning up the construction site

The first is to clean up the debris and install the water and electricity. Sprinkle cleaning to moisten the surface of the cast-in-place operation; pay attention to the watering must be even and do not have water accumulation.

3. Test whether the foam generator is regular in advance

The test method is to dilute the foaming agent according to a specific ratio, then make foam, and arrange the foam outside the machine to see whether the foam moisture content and the viscosity of the foam are standard.

Whether the bubble is about 1mm, if the moisture content is high, the cells may need to be replaced with steel balls.

15

4. During the construction of foamed concrete, it should be noted that the slurry of foamed concrete cannot stay, and it should be leveled immediately after pouring to make it stop.

To prevent the foam from breaking and collapsing after re-construction after static stop.

5. Attention should be paid to the influence of air temperature during the construction of foamed concrete. When the air temperature is below 10 degrees, a foaming agent with high stability and suitable for winter application should be selected.

When the air temperature is lower than 5 degrees, it is recommended to use early-strength composite Portland cement in addition to an excellent foaming agent. If conditions permit, a simple plastic greenhouse can be built.

6. Construction in summer requires main moisturizing and maintenance. There are two ways to choose, one is to cover straw curtains, reed mats, sacks, sawdust, wet soil, and wet sand, and the other is to cover with plastic sheets


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


Commodities such as crude oil, wheat, cotton, and nickel have rallied since Russia's "special military operations" began in late February. On the last trading day of this quarter, commodities were on track for their biggest gain since 1990. For this reason, it is expected that the price of the foamed concrete will continue to increase.

Inquiry us

Our Latest Products

Metal Alloy High Purity Tungsten Crucibles

About Metal Alloy High Purity Tungsten Crucibles:Chemical composition:…

Metal Alloy Vacuum Coating Tungsten Melting Pot Tungsten Crucibles

About Metal Alloy Vacuum Coating Tungsten Melting Pot Tungsten Crucibles:Chemical composition:…

Metal Alloy Fine Surface 19.15g/cm3 Tungsten Targets

About Metal Alloy Fine Surface 19.15g/cm3 Tungsten Targets:Chemical composition:…

0086-0379-64280201 brad@ihpa.net skype whatsapp