TR30 CLC Foaming Machine Concrete Foam Generator

In terms of international pricing benchmarks, according to the CP data released by Saudi Aramco, the propane contract price (CP) in March was $895 / ton, up $120 / ton from the previous month, up 15.48% from the previous month and up 43.20% from the same period last year. Butane contract price (CP) in March was 920 US dollars/ton, up 145 US dollars/ton compared with last month, up 18.71% month-on-month, up 54.62% compared with the same period last year; In March, CP in Saudi Arabia rose sharply, giving a strong boost to the international and domestic LPG market. Benchmark LPG prices are higher than a year ago as the economy continues to recover and demand for crude oil continues to repair. According to this trend, the market price of Concrete Foaming Generator will also be affected to a certain extent.

Description of TR30 foam generator

Foam Concrete Machine is the core equipment of foam concrete production, which has a significant impact on the quality of foam concrete. An excellent foam generator for concrete not only has a high foam output but more importantly, the quality of the foam produced is outstanding. TR30 foam generator developed by our company. It can be used in laboratories, small-scale foam concrete cast-in-situ projects, and pilot lines of foam concrete products. The outstanding advantages of TR30 foam generator are low foam moisture content, more foaming agent, high foam uniformity, large foam output, and other benefits.


Parameters of TR30 foam generator

Model

TR30

Maximum foam outputm3/h)

8

Motor voltage(V)

220

Work rate(W)

1500

Pump suction(m)

1-3

Dimensions(cm)

120*50*90

Weight(kg)

120


Usually need to be disassembled:

1. After working for a long time, it is found that the foam shape is not good, usually more than three months.

2. Pipe blockage: Some foaming agent remaining in the bubble tube will form a solid residue. In this case, the foam cannot be produced normally, or the pipeline pressure increases sharply. At this time, all the old steel balls need to be taken out, and then replaced with a new one The ball is fine. Steel wire ball specification requirements: each blowing tube needs to be filled with about 12-15 steel wire balls. Too much or too little will affect or even destroy the foam performance. 


Precautions:

1. Remember to use electricity safely. If water or foam touches the circuit, you must immediately cut off the power at the remote end to ensure safe production.

2. There will be air in the pipeline when it is used for the first time. The foaming liquid has not been pumped into the equipment in a short time. You can wait for tens of seconds until the liquid is filled with the entire suction tube and the foaming operation can be performed normally.

3. Do not start the equipment when the pipeline is blocked to prevent damage to the components due to overpressure in the pipeline.


If you are looking for foam generator please feel free to contact us and send an inquiry, email address: sales@cabr-concrete.com


Model: TR30
Maximum foam output(m3/h): 7.5
Motor voltage(V) : 220
Work rate(KW): 3
Foaming speed(L/m): 120
Bubble bleeding(kg/m3): 46
Dimensions(cm): 120*50*90
Weight(kg): 120

The current international situation is highly uncertain, and its economic impact has not been able to be assessed properly. In addition, rising energy and commodity prices and supply chain disruptions are expected to push the price of the Concrete Foaming Generator higher.

Inquiry us

Our Latest Products

Metal Alloy High Purity Tungsten Crucibles

About Metal Alloy High Purity Tungsten Crucibles:Chemical composition:…

Metal Alloy Vacuum Coating Tungsten Melting Pot Tungsten Crucibles

About Metal Alloy Vacuum Coating Tungsten Melting Pot Tungsten Crucibles:Chemical composition:…

Metal Alloy Fine Surface 19.15g/cm3 Tungsten Targets

About Metal Alloy Fine Surface 19.15g/cm3 Tungsten Targets:Chemical composition:…

0086-0379-64280201 brad@ihpa.net skype whatsapp